Commercial Roofing for Schools and Campus Buildings in Fort Collins, CO
Commercial Roofing
Industries We Serve
Roofing for CSU, Poudre School District, and Thompson School District Buildings
Campus and school roofs don't get to sit empty while we work. Colorado State University runs classes, labs, and dorms nearly year-round, and Poudre School District and Thompson School District only give us narrow windows between bells. We plan around that instead of asking a facilities office to plan around us.
Scheduling Around Academic Calendars, Not Around Us
CSU has three semesters plus a summer session, so there's rarely a true dead period on the main campus. K-12 downtime is tighter: winter break, spring break, and roughly ten weeks in the summer are the real windows for Poudre School District and Thompson School District tear-offs. When a job has to happen while a building is occupied, we sequence it around the school day, not the other way around.
That means staging away from entrances during passing periods, keeping crane and lift paths clear of bus loops, and holding off on the loud work during testing windows. On CSU's main campus it means routing material deliveries around move-in week for the residence halls and working with campus scheduling so a reroof doesn't land during finals in a building with a lecture hall underneath.
What's Actually Up There: Old Membrane, New Metal, and Everything Between
Older academic buildings on CSU's main campus have been added onto for decades, and it shows on the roof. It's common to find built-up roofing and modified bitumen sections butted up against a newer single-ply patch from the last time someone had a leak. Poudre School District and Thompson School District elementary and middle schools built or renovated in the last fifteen years mostly run TPO single-ply over lightweight insulation, with standing seam metal common over gyms and cafeterias where the roof line is more visible from the ground.
Rooftop mechanical is dense on both campus and K-12 buildings. Science buildings on CSU's campus carry exhaust curbs for lab fume hoods that need careful flashing, and school cafeterias and gyms usually carry their own rooftop units separate from the classroom wings. Every one of those penetrations is a place a roof can fail first.
Hail Alley Doesn't Skip Campus Roofs
Front Range hail alley runs through Fort Collins every spring and summer, and flat membrane roofs over gyms, cafeterias, and portable classrooms take the same beating as anything downtown. We see granule loss on older modified bitumen cap sheets, dents in rooftop unit cabinets and metal edge, and splits opening up at fastener heads on membranes that were already near the end of their service life.
A district facilities director dealing with a hail event usually has more than one building to worry about at once. We document each roof separately with dated photos and a per-building condition report so a claim covering six schools doesn't turn into one confused file. We describe what we find; we don't promise what an adjuster or insurer will decide to pay.
- A single point of contact who can speak to work happening on five buildings instead of five separate contractors
- Staging plans that keep dumpsters and material lifts away from bus loops, playgrounds, and pedestrian paths
- Warranty paperwork filed in the format a district's bond counsel or CSU's procurement office actually asks for
- Roof access coordinated through campus security or a building's keyholder, not a crew showing up unannounced
- Work sequenced building by building so a whole wing isn't down at once during finals or state testing
- Moisture surveys done before a reroof gets specced, so a district isn't paying to cover wet insulation
Bond Cycles and Capital Improvement Lists
Districts fund reroofs through multi-year bond packages, which means we're often handed a list of five or six schools spread across two or three summers rather than a single job. We price and spec that list as one contract so every building gets the same system, the same warranty terms, and detail sheets that stay organized in the district's asset management records.
CSU capital projects run through campus facilities management and often bundle roofing with mechanical upgrades happening at the same time. We coordinate with whatever general contractor or mechanical crew is already mobilized on site instead of working around them blind.
We also try to flag roofs that are close to the end of their service life before they turn into an emergency mid-semester. A short walk-through every year or two, with photos and a plain read on remaining life, gives a facilities office something concrete to put in front of a school board or a bond committee instead of guessing at timing.
Questions We Get From District and Campus Facilities Staff
Can you work on an occupied school without disrupting classes?
Yes. We schedule the loud, disruptive work for after hours or breaks where possible, and when that's not possible we sequence around class periods and keep staging away from student traffic.
Do you handle roofs across multiple school buildings under one contract?
That's the normal setup for bond-funded work. We price the whole list together and keep specs consistent building to building.
What roof systems are most common on Fort Collins area schools?
TPO single-ply is standard on newer construction, older wings still carry built-up roofing or modified bitumen, and standing seam metal shows up over gyms and cafeterias.
How do you document hail damage across a district's whole roof portfolio?
We photograph and write a condition report for each building separately, with dates and slope-by-slope detail, so an adjuster can review each roof on its own facts.
Do you coordinate directly with CSU facilities management, or do we need a separate contact?
We work directly with whoever manages the building on campus, so there's one contractor relationship instead of a chain of go-betweens.